Estimating · Proposals · Scheduling

One record from first estimate to project closure.

An estimate-to-schedule platform: Orditur replaces the spreadsheet estimate, the Word proposal and the disconnected P6 file with a single system where scope, price, work and schedule stay tied together.

One record.Every surface.No re-keying.
Project IDVP-24-118 · AUTOCLAVE QUALIFICATION
Critical path
W01W02W03W04W05W06W07W081Autoclave AC-2011.1Impact assessment1.2IQ protocol1.3IQ execution1.4OQ protocol1.5OQ execution1.6PQ execution1.7Summary report
Critical Non-critical Total float Data date
4

surfaces

Estimate · propose · schedule · control

1

record

No re-keying between stages

0

seat licences

Runs in the browser

The unbroken thread

Four stages. One dataset. Nothing re-keyed.

Scope priced once flows straight through to the proposal, the work breakdown structure and the critical path. Nothing is retyped, so nothing drifts.

  1. 01

    Estimate

    Scope item by item. Every deliverable — survey, design, build, test, qualification, close-out report — priced at role-level hours against a governed rate card.

    • Scope templates by asset or work type
    • Risk and complexity multipliers
    • Live margin by line, category, project
  2. 02

    Propose

    The approved estimate becomes the proposal. Pricing tables, assumptions, exclusions and standards references assemble themselves.

    • Reusable content blocks
    • Your own standards and clause library
    • Print-ready document, versioned
  3. 03

    Schedule

    Award converts the estimate into a work breakdown structure with a real CPM network — not a bar chart someone dragged into shape.

    • FS/SS/FF/SF logic with lead and lag
    • Working calendars and hard constraints
    • Resource levelling within or beyond float
  4. 04

    Control

    Baseline it, then track the truth. Earned value, schedule health and variance against the number you actually sold.

    • SPI / CPI to the original estimate
    • DCMA-style schedule quality checks
    • Client-facing shared timelines

Inside the console

Four working surfaces, one governed core.

Every surface reads the same record. Change a rate, a duration or a dependency and the consequence shows up everywhere it matters.

01

Portfolio

Performance, cost and resource load across every active engagement.

  • SPI / CPI rollup
  • Resource heatmap
  • 60-day milestone horizon
02

Estimate

Spreadsheet-grade grid with governed rates and live margin.

  • Grouped by asset or work package
  • Override tracking
  • Contingency and markup
03

Schedule

Full CPM network with calendars, constraints and levelling.

  • Critical path and float
  • Dependency logic with lag
  • Baseline variance
04

Client view

A read-only timeline link that shows progress and nothing else.

  • Token scoped, revocable
  • No rates, no cost
  • Expiry dates

Position

Everything P6 schedules — plus the estimate that sold it.

One record: price the scope, send the proposal, schedule the work, track the money.

  • Full CPM engine with float and lag

    Orditur
    P6
    MSP
  • Resource levelling within float

    Orditur
    P6
    MSP
  • Estimate and price feed the schedule

    Orditur
    P6
    MSP
  • Configurable deliverable libraries per industry

    Orditur
    P6
    MSP
  • Proposal generated from the same record

    Orditur
    P6
    MSP
  • Earned value against the sold estimate

    Orditur
    P6
    MSP
  • Schedule quality diagnostics

    Orditur
    P6
    MSP
  • Client-shareable timeline link

    Orditur
    P6
    MSP
  • Runs in a browser, no licence per seat

    Orditur
    P6
    MSP

Principles · 01—05

Five rules from the board, each one a working part.

The brand marks are not decoration — every principle maps to something the product actually enforces.

01
Foundation

Build from first principles. Structure everything.

Scope, deliverables and rates defined before a single date exists.

02
Momentum

Move forward. With purpose.

CPM drives the plan; progress and earned value keep it honest.

03
Clarity

One path. No ambiguity.

One critical path, one record, one shared timeline for the client.

04
Systems

Organized. Measured. Connected.

Estimate, proposal, schedule and actuals on the same data core.

05
Precision

Every element in its place.

Resource levelling, calendars and constraints to the day.

The word

A project is warp and weft.

The word carries four senses at once, and the product is built on the same four: the plan you string, and the work you weave across it.

The entry

orditur

/ˈor.di.tur/

Latin · verb · 3rd person singular present

He, she, or it begins; commences; weaves, lays the warp.

From the deponent verb ordior — to lay the warp threads on a loom before a single row can be woven. Figuratively: to set about, to undertake, to start the work in earnest.

“…bellum Troianum orditur.”

Horace · Ars Poetica — “he begins the Trojan War”

Not oritur (“it arises”). Nothing here arises on its own — it is strung, measured and begun on purpose.

Four senses · one record

01Estimate

he, she, or it begins

The estimate is the first commitment. Every downstream number descends from it.

02Proposal

commences

The priced scope becomes a signed obligation, with no re-keying in between.

03Baseline

lays the warp

The warp is the fixed thread strung before weaving. Here it is the baseline schedule.

04Execution

weaves

Progress, cost and float cross the baseline row by row — the weft on the warp.